Link

Social

Embed

Disable autoplay on embedded content?

Download

Download
Download Transcript


GOOD AFTERNOON.

WELCOME.

[ Building Inspections Upcoming Code Changes on September 21, 2022]

[00:00:04]

THANKS JOHNNY.

.

HI, MY NAME IS SUZANNE ARNOLD.

I AM THE CHIEF BUILDING OFFICIAL OF THE CITY OF MCKINNEY.

I HAVE BEEN WITH THE CITY SINCE JANUARY, UH, BEFORE THAT I WAS AN INSPECTOR AND A RESIDENTIAL PLANS EXAMINER FOR A COUPLE OF DECADES BEFORE THAT.

SO HOPEFULLY I CAN HELP YOU OUT WITH ANY QUESTIONS YOU HAVE.

AND IF NOT, I'VE GOT MY PANEL OF EXPERTS HERE ON THE FRONT, TWO ROWS TO HELP YOU.

SO WE'RE HERE TODAY TO TALK ABOUT THE UPCOMING CHANGES TO THE CODE.

WE'RE SWITCHING TO THE 2021 INTERNATIONAL CODES EFFECTIVE JANUARY 1ST, 2023.

WE WANNA TALK ABOUT THE RESIDENTIAL PROVISIONS TODAY.

RESIDENTIAL PROVISIONS ARE COVERED IN MULTIPLE AREAS.

UH, WE'RE GONNA GO OVER THE INTERNATIONAL RESIDENTIAL CODE CHANGES, INCLUDING GENERAL CONSTRUCTION, MECHANICAL, ELECTRICAL, AND PLUMBING, THE INTERNATIONAL ENERGY CONSERVATION CODE, THE INTERNATIONAL SWIMMING POOL IN SPA CODE AND THE INTERNATIONAL EXISTING BUILDING CODE, WHICH IS A NEW ONE.

WE'LL GO OVER.

CODES ARE UPDATED EVERY THREE YEARS.

SO IF YOU LOOK AT THE ICC CODES, YOU'RE GONNA SEE MULTIPLES OF THREE IN THE DIFFERENT INCREMENTS.

THERE'S A REASON FOR THAT.

THERE'S A LOT THAT GOES INTO EACH OF THE CODE CHANGES.

AND I WANT YOU TO UNDERSTAND THAT THESE ARE SOMETHING THAT THE CODE COMMUNITY TAKES VERY SERIOUSLY.

CODES ARE DEVELOPED THROUGH A LONG PROCESS.

ANYONE CAN SUBMIT POTENTIAL CHANGES PROCESSED BY COMMITTEE VOTED ON BY CODE OFFICIALS PROCESSED BY ANOTHER COMMITTEE, PUBLICIZED, ANALYZED BY THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS ANALYZED BY THE CITY.

AND THEN FORMALLY ADOPTED CITIES HAVE TO ACTUALLY ADOPT CODE VERSIONS INTO ORDINANCE FOR THEM TO BE THE LAW OF THE LAND.

SO THAT'S THE PROCESS THAT WE'RE GOING THROUGH.

NOW, WE'LL GO AHEAD AND LAUNCH INTO THE INTERNATIONAL RESIDENTIAL CODE CHANGES.

THERE WAS A CHANGE IN THE DEFINITION OF A GRADE FLOOR, EMERGENCY ESCAPE AND RESCUE OPENINGS.

YOU MAY KNOW THAT THE WINDOW OPENING SIZE IS LAST FOR THE GROUND FLOOR, THAT IT IS FOR UPPER FLOORS FOR EMERGENCY ESCAPE AND RESCUE THE CODE.

NOW CLARIFIES THAT IN ORDER TO GET THAT GROUND FLOOR QUALIFICATION, IT CAN BE NO MORE THAN 44 INCHES ABOVE OR BELOW ADJACENT GRADE TO THE BOTTOM OF THE OPENING, NOT THE SI.

THE CODE HAS ALSO ADOPTED LANGUAGE, FORMALLY ADDRESSING, UH, INTERMODAL SHIPPING CONTAINERS AS A MEANS OF CONSTRUCTION.

UH, THEY'RE NOW RECOGNIZED AND REGULATED BY THE CODES.

NOW THERE'S ALSO A SUPPLEMENT TO THE CODES THAT GOES INTO GREATER DETAIL ABOUT SHIPPING CONTAINER CONSTRUCTION.

AND IF YOU AREN'T FAMILIAR WITH IT, THE CITY OF MCKINNEY HAS A NEW SUBDIVISION ON THE EAST SIDE BEING BUILT BY HABITAT FOR HUMANITY CALLED COTTON GROVES.

THAT'S BEING CONSTRUCTED ENTIRELY OF SHIPPING CONTAINER BUILDINGS.

IF YOU HAVEN'T SEEN IT GO OUT THERE.

IT'S REALLY PRETTY NEAT.

THEY'RE DOING, UH, DUPLEXES WITH FOUR CONTAINERS FOR EACH DWELLING UNIT.

PRETTY NEAT STUFF.

THERE WAS A CHANGE TO THE ULTIMATE DESIGN, WIND SPEED.

THEY RECALCULATE THIS EVERY COUPLE OF CODE CYCLES, AND IT'S NOW 1 0 5 FOR OUR AREA.

THEY CHANGED THE DEFINITION OF STORY HEIGHT TO 13 FOOT SEVEN INCHES PROVIDED YOU MEET THE FRAMING REQUIREMENTS AND, UH, THERE'S ADDITIONAL PROVISIONS FOR THE DWELLING GARAGE OPENING.

UM, SO THE DOOR HAD TO BE SOLID CORE.

IT HAD TO BE WEATHER STRIPPED.

IT HAD TO BE SELF-CLOSING AND NOW THEY'VE ADDED THAT IT HAS TO BE SELF LATCHING.

SO YOUR KIDS ARE NOT GONNA LEAVE THAT DOOR OPEN BETWEEN THE HOUSE AND THE GARAGE.

THIS IS SOMETHING NEW ADDED BY THE COUNCIL OF GOVERNMENT'S AMENDMENTS REQUIRES BLOCKING FOR FUTURE HANDICAPPED, GRAB BARS AROUND AT LEAST ONE GROUND FLOOR TOILET.

IF YOU HAVE A BATHROOM ON THE FIRST FLOOR, YOU NEED TO GO AHEAD AND PROVIDE BLOCKING CUZ HEY, THIS COULD BE SOMEBODY'S FOREVER HOME THAT YOU GROW OLD IN AND YOU MAY EVENTUALLY WANNA PUT UP GRAB BARS IN THAT BATHROOM.

THERE'S A NEW SECTION ABOUT SMOKE ALARMS IN CASES LIKE THIS PICTURE WHERE YOU HAVE A LOWER HALLWAY ADJACENT TO A HIGHER CEILING ROOM.

IF THE CHANGE IN THE CEILING HEIGHT IS MORE THAN 24 INCHES, THEN THE LAWS OF PHYSICS SAY THE SMOKE IS GONNA RISE AND POSSIBLY PASS THE SMOKE DETECTOR AT THAT LOWER CEILING HEIGHT.

SO YOU STILL HAVE TO PUT ONE UP HIGH.

IN THAT CASE, THERE'S A CLARIFICATION THAT WHEN YOU HAVE A LIVE WORK UNIT, THEN THE COMMERCIAL PORTION OF IT DOES HAVE TO MEET ACCESSIBILITY REQUIREMENTS.

ALSO A CLARIFICATION

[00:05:01]

ABOUT STORM SHELTERS.

IF YOU BUILD IN A STORM SHELTER IN YOUR HOUSE, YOU CAN'T CALL IT A STORM SHELTER, UNLESS IT ACTUALLY MEETS THE ICC 500 GUIDELINE AND YOU HAVE THE ENGINEERED DOCUMENTS TO PROVE IT.

OTHERWISE IT'S JUST A REALLY EXPENSIVE CLOSET.

NOW THE CODE EVOLVES CONSTANTLY TO ADDRESS NEW TECHNOLOGIES.

AND JUST IN THE LAST THREE YEARS THROUGH THIS CODE CYCLE, WE'RE SEEING MORE AND MORE SOLAR SHINGLES ALSO CALLED, UH, BUILDING INTEGRATED PHOTOVOLTAIC SYSTEMS, SOLAR SHINGLES, UM, WITH TRADITIONAL SOLAR PANELS, YOU'RE REQUIRED TO DESIGN IT WHERE YOU HAVE FIRE DEPARTMENT ACCESS.

AISLEWAY UP THE RIDGES ACROSS THE TOP FOR THE FIRE DEPARTMENT TO GET UP ON THE ROOF, DO THEIR THING, GET AROUND, CUT HOLES.

IF THEY NEED TO, TO VENT THE SMOKE.

SOLAR SHINGLES IN MANY CASES ARE CARRYING A LOWER VOLTAGE, WHICH MAKES THEM LESS OF A HAZARD.

SO IF CUTTING INTO THOSE SOLAR SHINGLES IS NOT GONNA ELECTROCUTE A FIREMEN CUZ YOU KNOW, THEY WANNA GET UP THERE WITH THEIR SAWS ALLS.

THEN YOU DON'T HAVE TO LEAVE THE AISLEWAY AROUND, WHICH ACTUALLY KIND OF MAKES MORE SENSE AESTHETICALLY TO DO THE SOLAR SHINGLES ON THE ENTIRE FACE OF A ROOF.

THERE'S A NEW AMENDMENT THAT THE COUNCIL OF GOVERNMENTS ADDED REQUIRING A ONE-TO-ONE RATIO OF THE DEPTH TO THE HORIZONTAL DISTANCE, TO A BUILDING FOR A POOL EXCAVATION.

NOW THAT'S TO THE WALL OF THE EXCAVATION.

BASICALLY IT'S ASSUMING THAT THE LOADING ON THE FOUNDATION FROM THE HOUSE IS GONNA HAVE APPROXIMATELY A 45 DEGREE LINE AS FAR AS THE BEARING THAT'S ABSORBED BY THE SOIL.

SO IF THE POOL EXCAVATION IS ANY CLOSER THAN THAT, YOU HAVE TO SUBMIT AN ENGINEER'S LETTER AND POTENTIALLY AN ALTERNATE DESIGN.

BEEFING THAT UP A LITTLE BIT MORE IF THAT BECOMES NECESSARY.

SO IF YOU'RE THREE FEET AWAY FROM THE HOUSE AND THE POOL IS GREATER THAN THREE FEET AT THAT POINT PROBLEM, IF YOU'RE THREE FEET AWAY FROM THE HOUSE AND THE POOL IS ONLY 18 INCHES DEEP AT THAT POINT.

NO PROBLEM.

SO YOU'RE TALKING ABOUT THE EXCAVATION UP THE FACING POOL.

MM-HMM WHAT ABOUT TO THE DISTANCE TO THE BOTTOM, BETWEEN TO THE BOTTOM OF THE BEAM, THE FOUNDATION BEAM? NO, IT'S JUST THE HORIZONTAL DISTANCE TO THE FOUNDATION.

ASSUMING THE LOADING IS BASICALLY CARRIED DOWNWARD.

THIS HAS BEEN A BEST PRACTICE FOR A LONG TIME.

AND THIS HAS BEEN SOMETHING THAT, THAT WE REFER TO THIS ISN'T REALLY A NEW THING, BUT ACTUALLY CODIFYING IT IS NEW.

THAT ALSO BE TO THE BOTTOM OF THE DISTURB.

IN OTHER WORDS, THE BOTTOM OF GUN, NOT YOU, YOU CALL FOR A FIVE DEEP EXCAVATION, THE FACE, THE EXCAVATION ON THE MM-HMM YEAH, THE, THE AMENDMENT ISN'T REALLY THAT SPECIFIC IN ITS WORDING, BUT IT'S PRESUMED TO BE THE EXCAVATION CUZ THAT'S REALLY THE POINT WHERE YOU'D BE UNDERMINING WHATEVER THE SOIL LOADING IS.

OKAY.

NOW A LOT OF TIMES WE DO SEE THEY'LL PUT THE STEPS OR THE TANNING BENCH OR SOMETHING LIKE THAT IN THAT AREA TO GET OVER THAT ONE-TO-ONE RATIO.

IF THE POOL IS ESPECIALLY SHALLOW IN THAT AREA, IT'S GENERALLY NOT MUCH OF AN ISSUE.

WHAT ABOUT TO RETAIN ONE? YOU SAY YOU'VE GOT YOU'RE ON THE LOWER SIDE.

YOU GOTTA RETAIN ONE BACK AT SOMETHING THAT'S NOT SPECIFICALLY ADDRESSED, BUT IT'S KIND OF BEEN DISCUSSED AND IMPLIED BY THE, THE, UH, COMMITTEES OR THE COUNCIL OF GOVERNMENTS THAT WE FEEL THAT'S NECESSARY.

BUT IN SOME CASES WE JUST HAVE TO DEFER BACK TO AN ENGINEER.

I MEAN, IF YOU'RE, IF YOU'RE DIGGING RIGHT AT THE FOOTING OF RETAINING WALL, WE'RE PROBABLY GONNA SEND YOU TO GET AN ENGINEER'S LETTER ANYWAY, WE'VE SEEN IT HAPPEN.

I KNOW ITS TIGHT BACKYARDS.

THAT'S WHY WE HAVE TO ADDRESS THESE THINGS.

IF THE HOUSE IS ON HERE, THEN THAT KINDA GOES AWAY WITH SO LONG.

THAT REQUIREMENT NOT NECESSARILY THE, THE AMENDMENT IS NOT THAT SPECIFIC.

IT'S JUST FROM THE FOUNDATION LOADING OUTWARD TO TRY TO KEEP THAT ONE TO ONE DECKS ARE A NEW THING.

BASICALLY THE STRUCTURAL DESIGN CRITERIA THAT GOES INTO DECKS WAS REVISED.

SO THAT WHOLE SECTION IS SUBSTANTIALLY REWRITTEN.

THERE ARE A LOT MORE, UH, LOAD CHARTS, ET CETERA, EVERYTHING FROM THE PEERS TO THE FRAMING, JUST TAKING A DIFFERENT APPROACH, I GUESS, TO DECKS.

SO COUNT ON THAT ENTIRE SECTION BEING REWRITTEN GARAGE DOORS ARE ANOTHER THING THAT'S EVOLVING AND I'M GLAD TO SEE IT.

GARAGE DOORS ARE TYPICALLY THE WEAKEST POINT OF A BUILDING.

IF THERE'S ANY KIND OF WIND EVENT, THAT'S GONNA BE THE FIRST THING TO GO.

[00:10:01]

SO OVER TIME, THE CODE HAS GROWN TO ADDRESS THESE THINGS IN GARAGE DOOR DESIGN.

THE CODE IS NOW REQUIRING A LABEL ON ALL GARAGE DOORS.

THAT INCLUDES EVERYTHING FROM THE MANUFACTURER AND SERIAL NUMBER TO THE POSITIVE AND NEGATIVE DESIGNED WIND PRESSURE RATINGS AND THE TESTING STANDARD THAT ARRIVED AT THOSE.

SO GOING FORWARD, WE'RE GONNA BE LOOKING FOR THAT LABEL ON NEW GARAGE DOORS.

THERE'S SOME NEW LANGUAGE ON DRYER, VENT TERMINATION.

IF THE MANUFACTURER CALLS FOR A PARTICULAR CLEARANCE FROM OPENINGS.

GREAT.

IF THE MANUFACTURER DOES NOT SPECIFY, THEN IT'S THREE FEET IN ALL DIRECTIONS, INCLUDING VENTED SOFTENS.

WE USED TO ALLOW COMMERCIAL COOKING APPLIANCES AND HOUSES.

IF IT'S ENGINEERED THAT ALLOWANCE HAS BEEN REMOVED NO MORE COMMERCIAL COOKING APPLIANCE AND RESIDENCES.

TH THIS IS ONE FOR ALL OUR BUILDERS TO KEEP IN MIND.

THE HEAD PRESSURE FOR TESTING DWV PIPING HAS GONE FROM FIVE FEET BACK UP TO 10 FEET.

THIS IS HOW IT USED TO BE TO CODE CYCLES BACK.

SO THIS ISN'T ENTIRELY NEW.

IT WAS REDUCED TO FIVE FEET IN THE 15 AND 18.

NOW WE'RE BACK UP TO 10 FEET FOR TESTING.

SO WE'RE GONNA BE LOOKING FOR THE RISERS TO BE A FULL 10 FEET.

MAKE SURE THAT THEY'VE GOT THE WATER TEST ON 'EM AIR VACUUM TESTING IS ALSO ALLOWED FOR PLASTIC PIPE UNDER CERTAIN CIRCUMSTANCES.

THE DEVELOPED LENGTH OF HOT WATER PIPING TO FIXTURES IS LIMITED TO A HUNDRED FEET CLOSE TO A HUNDRED FEET, BUT THE RULE OF THUMB A HUNDRED FEET, IF YOU CAN'T MEET THE A HUNDRED FEET, THEN WE START HAVING TO TALK ABOUT RECIRCULATING PUMPS AND WHATNOT FOR LARGER HOUSES.

SO WHEN YOU'RE CONSIDERING YOUR DESIGN, IF YOU YOU'RE DOING A MUCH LARGER HOUSE WITH MULTIPLE WATER HEATERS, YOU MIGHT WANNA CONSIDER SPACING THEM ACCORDINGLY.

SO THAT YOU'RE, YOU'RE NOT PUTTING TWO ON THIS END AND RUNNING ALL THE WAY OVER TO THE OTHER END, REMOVABLE FIXTURE TRAPS AS CLEAN OUT THE CODE NOW SAYS, IF YOU HAVE A SINK OR OTHER FIXTURE THAT YOU CAN TAKE OFF REAL EASILY OR PULL THE TRAP OFF OF REAL EASILY, IT CAN SERVE AS THE CLEANOUT.

NOW THAT SAID IT STILL HAS TO BE PLACED WHERE A CLEANOUT NEEDS TO BE PLACED.

YOU STILL HAVE TO HAVE THE REQUIRED NUMBER OF CLEANOUTS.

JUST SAYING, IF YOU'VE GOT A SINK THAT YOU CAN PULL OFF WITHOUT MESSING UP THE PLUMBING, LIKE SOMETHING THAT'S PRETTY EASILY REMOVABLE, THEN YOU COULD IN A PINCH USE THAT AS A CLEANOUT.

ANOTHER INSTANCE OF THE CODE, ADAPTING TO NEW TECHNOLOGY, THE RELINING AND REHABILITATION OF BUILDING SEWERS, WHERE THEY COME BACK IN AND INJECT THE I'M NOT SURE WHAT YOU CALL THE MATERIAL INSIDE YOUR PIPES TO TAKE CARE OF AT LEAST SMALLER LEAKS AND TRY TO SAVE A, REPLACING A SEWER PIPE.

THIS TECHNOLOGY WAS SOMETHING THAT WAS A LITTLE DIFFICULT FOR THE CODE TO GET THEIR HANDS AROUND AT FIRST.

BUT NOW IT'S ADDRESSING THE NEW TECHNOLOGY.

BASICALLY THIS IS AN ACCEPTED PRACTICE, BUT THERE'S A CERTAIN PROCEDURE THAT MUST BE FOLLOWED, INCLUDING PRE CAMERAING, CLEANING, LINING POST CAMERAING AND ALL OF THE EVIDENCE HAVING TO BE SUBMITTED, SUBMITTED TO AN INSPECTOR.

YOU KNOW, WE STILL HAVE TO KNOW WHAT'S GOING ON.

SOMEHOW.

WE STILL HAVE TO BE ABLE TO HAVE ASSURANCE THAT THIS WAS DONE CORRECTLY.

SO THE PROCEDURE MUST BE FOLLOWED IN ORDER FOR THE CITY TO ACCEPT THIS AS REPAIR.

NOW, WE'VE BEEN UNDER THE 2020 NATIONAL ELECTRIC CODE FOR A YEAR NOW BECAUSE IT'S MANDATORY FOR THE STATE, BUT A COUPLE OF PROVISIONS OF IT THAT PERTAIN TO, UH, RESIDENTIAL ARE THAT A READILY ACCESSIBLE DISCONNECT IS REQUIRED.

AND ALSO A SEARCH PROTECTIVE DEVICE IS REQUIRED ENERGY CONSERVATION CODE.

THIS IS ALWAYS A MOVING TARGET.

THE ENERGY CODE DOES ALLOW MULTIPLE COMPLIANCE PATHS.

SO YOU CAN'T SAY WE DIDN'T GIVE YOU OPTIONS HERE.

THERE'S THE PRESCRIPTIVE COMPLIANCE OPTION.

THE TOTAL BUILDING PERFORMANCE OPTION, THE ERI OPTION, THE TROPICAL CLIMATE ZONE OPTION, NOT SO MUCH HERE.

AND, UH, THERE IS ANOTHER OPTION, THE ADDITIONAL ENERGY EFFICIENCY OPTION, BUT THAT HAS BEEN DELETED BY AMENDMENT.

IT'S KIND OF A REALLY COMPLICATED THING.

AND THE OTHER OPTIONS WILL SUFFICE.

THERE'S A NEW DEFINITION FOR THERMAL DISTRIBUTION EFFICIENCY.

THAT'S THE PERCENT DIFFERENCE BETWEEN THE INLET TEMPERATURE AND THE OUTLET

[00:15:01]

TEMPERATURE OF AN AIR DUCT, UH, THERMAL ENVELOPE CERTIFICATE.

THIS REQUIREMENT HAS BEEN EXPANDED.

UM, YOU HAVE TO INCLUDE THE BUILDING ENVELOPE, ENERGY VALUES, THE CODE EDITION ERI, WHICH COMPLIANCE PATH YOU USE.

AND IF YOU DO HAVE A PV SYSTEM ON THE HOUSE, IT HAS TO INCLUDE INFORMATION ABOUT THAT.

NOW Y'ALL MAY HAVE HEARD THAT THERE WAS A CLIMATE ZONE CHANGE IN THE DALLAS FORT WORTH AREA, ESPECIALLY IF YOUR COMPANIES ARE WORKING THROUGHOUT THE AREA THAT THIS WAS SORT OF AN, UH, UM, MONKEY WRENCH THROWN INTO OUR INDUSTRY BECAUSE THE DFW AREA IS NOW DIVIDED INTO TWO CLIMATE ZONES, ZONE ONE AND ZONE TWO, CUZ EVERYBODY KNOWS WHEN YOU PASS FROM DALLAS COUNTY INTO COLIN COUNTY, YOU GET A CHILL, RIGHT? WANT YOU TO KNOW THAT DOESN'T AFFECT US? WE ARE COLIN COUNTY IS STILL CLIMATE ZONE.

THREE, NOTHING HAS CHANGED AS ALWAYS EVERY CODE EDITION, THE R VALUES AND YOU FACTOR REQUIREMENTS INCREASE.

HOWEVER, THIS IS AN OFF YEAR FOR THE STATE TO ADOPT THE ENERGY CODE AND FOR THE ADDITIONS THAT THE STATE DOESN'T ADOPT, THEN THE COUNCIL OF GOVERNMENTS HAS A LITTLE BIT MORE LEEWAY IN WHAT WE CAN AMEND.

SO THE COUNCIL OF GOVERNMENT'S AMENDMENTS, WHICH ARE SHOWN HERE BY THE NUMBERS, CROSSED OUT IN THE OTHER NUMBERS, ADDED SOFTEN THE BLOW A LITTLE BIT OF THE INCREASES IN THESE REQUIREMENTS.

SO YOU'RE NOT GONNA SEE A SUBSTANTIAL CHANGE IN HOW TO CONSTRUCT YOUR BUILDINGS UNDER THIS YEAR'S ENERGY CODE.

AND ONCE AGAIN, THE SLAB INSULATION REQUIREMENT HAS BEEN DELETED BECAUSE WE ARE A HIGH TERMITE PRONE REGION AND THAT TRUMPS THE SLAB INSULATION REQUIREMENT BECAUSE THAT JUST MAKES IT WORSE FOR SURE.

ATTIC DOOR HATCHES.

THIS IS SOMETHING WHERE THE, THE CODE HAS KIND OF TALKED AROUND IT BEFORE, BUT NOW IT JUST STRAIGHT UP SAYS THE DOOR PANEL HAS TO BE R 10 AND WEATHER STRIPPED.

THERE'S ALSO LANGUAGE ABOUT INSULATION RETENTION.

BASICALLY YOU HAVE TO BUILD A LITTLE DAM AROUND THE ATTIC OPENING AND AT ANY DROP OFF.

SO YOU DON'T HAVE THE ISSUE WITH THE BLOWN IN INSULATION, JUST FALLING OFF THE EDGE, SOME NEW STUFF ABOUT TESTING OR AIR LEAKAGE.

TESTING ADDED A DEFINITION FOR DWELLING UNIT ENCLOSURE AREA.

THAT'S THE SUM OF THE SURFACES BORDERING AND CONDITION SPACE.

THE MAXIMUM RATE IS THREE ACH UNDER, UNDER THE PRESCRIPTION PATH.

FIVE ACH ARE 0.28 CFM PER SQUARE FOOT DWELLING UNIT ENCLOSURE AREA FOR OTHER PATHS, DUCKS AND CONDITION SPACES ARE NO LONGER EXEMPT FROM TESTING AND A MECHANICAL VENTILATION SYSTEM TESTING IS REQUIRED TO CONFIRM THAT THE VENTILATION RATE IS INTENT IS AS INTENDED BY CODE AND BY DESIGN INTERIOR LIGHTING CONTROLS.

SO THE CODE CAME UP WITH A REVISION THAT REQUIRES OCCUPANT SENSORS OR SENSORS OR DIMMERS ON INTERIOR LIGHTS IN A HOUSE.

WELL, WE UNDERSTAND THAT THAT IS A SIGNIFICANT, HIGHER, SIGNIFICANTLY HIGHER COST TO BUILDERS THAN THE STANDARD GIANT CONTRACTOR BOX OF SWITCHES.

WELL, I'M ON THE, THE COUNCIL OF GOVERNMENT'S BOARD THAT WENT OVER THE ENERGY CODE AND WE WERE KIND OF THINKING ABOUT OCCUPANT SENSORS IN A HOUSE.

AND WE FIGURED THAT THAT WAS NOTHING MORE THAN A GOOD WAY FOR YOUR CAT TO TURN THE LIGHT ON IN THE MIDDLE OF THE NIGHT.

SO WHAT DO PEOPLE DO WHEN SOMETHING IS A NUISANCE, THEY REPLACE IT WITH THE CHEAP VERSION ANYWAY.

SO WE DELETED THAT PART FOR NOW.

WE'VE GOT AN AMENDMENT THAT IS NOT A REQUIREMENT, NO OCCUPANT SENSORS REQUIRED IN YOUR HOUSE.

EXTERIOR LIGHTING CONTROLS.

THERE'S A CLARIFICATION THAT EXTERIOR LIGHTS HAVE TO HAVE AN ON OFF SWITCH AND AN ALIGHT SENSOR.

AND IF YOU'RE GROWING WITH THE ERI FOR CLIMATE ZONE THREE, IT'S 59 NOW REGARDING THE SWIMMING POOL AND SPA CODE, THIS IS KIND OF A DUH, IT'S JUST NEW LANGUAGE IN THE CODE.

IT'S NOT LIKE WE NEVER REQUIRED YOU TO HAVE A TEMPORARY FENCE AROUND YOUR POOL BEFORE, BUT THE CODE COMES OUT AND SAYS A FOUR FOOT TALL, TEMPORARY CONSTRUCTION FENCE WILL BE IN PLACE FROM THE VERY START OF EXCAVATION UNTIL YOU COMPLETE THE REAL FENCE.

OKAY.

THIS IS SOMETHING THAT'S KIND OF NEW, THE INTERNATIONAL EXISTING BUILDING CODE.

NOW THE STUDY HAS BEEN REFERRING TO THIS FOR A WHILE A, AS IT IS REFERENCED IN THE OTHER CODES, WE HAVE NOT PREVIOUSLY ADOPTED THE BOOK IN

[00:20:01]

ITS ENTIRETY, BUT WE'RE SEEKING TO THIS TIME.

THE INTENT OF THIS CODE IS TO PROVIDE A LITTLE FLEXIBILITY IN YOUR APPROACH TO CH ACHIEVE COMPLIANCE WITH THE MINIMUM REQUIREMENTS, BUT MAYBE GO AT A GO ABOUT IT A LITTLE DIFFERENT WAY, EXISTING RESIDENTIAL BUILDINGS.

YOU CAN COMPLY WITH THE IRC.

IF YOU CAN, IF YOU CAN'T, WE CAN START TALKING ABOUT THE I C THIS APPLIES TO REPAIR ALTERATION, ADDITION AND RELOCATION OF EXISTING BUILDINGS.

AND IT HELPS IN DEALING WITH BUILDINGS THAT WERE BUILT UNDER A PRIOR CODE WHERE STRICT COMPLIANCE JUST ISN'T GONNA HAPPEN.

THIS CODE USES THE TERM TECHNICALLY INFEASIBLE A LOT.

AND THAT'S REALLY WHAT IT BOILS DOWN TO THIS CODE PROVIDES ALTERNATIVE APPROACHES WHEN STRAIGHT COMPLIANCE IS TECHNICALLY INFEASIBLE, LIKE ALL THE OTHER CODES, IT GIVES ME THE RIGHT TO EVALUATE ALTERNATIVES.

AND, UH, THERE, THERE IS AN AMENDMENT CLARIFYING THAT WHAT WE'RE CALLING EXISTING BUILDINGS IS SOMETHING THAT WAS APPROVED AT LEAST TWO CODE EDITIONS BACK.

IF IT WAS JUST THE LAST CODE EDITION, THERE'S NO REASON THAT YOU CAN'T COMPLY.

AND LIKE THE OTHER CODES, IT HAS A LOT OF FINGERS THAT GO INTO THE OTHER BOOKS.

THE EXISTING BUILDING CODE, THE REQUIREMENTS ARE BASED ON THE CLASSIFICATION OF WORK.

THAT INCLUDES REPAIRS, WHICH ARE PRETTY SELF EXPLANATORY.

A LEVEL ONE ALTERATION WOULD BE MOSTLY COSMETIC FINISHES.

LEVEL TWO ALTERATION IS GONNA BE MORE EXTENSIVE, BUT STILL LESS THAN 50% OF THE BUILDING LEVEL THREE MORE THAN 50% ANY CHANGE IN OCCUPANCY IS ADDRESSED SEPARATELY.

AND NOW THAT'S NOT REALLY A THING WITHIN THE RESIDENTIAL REALM.

YOU'RE NOT GONNA GET CHANGES, UH, ADDITIONS, AND THEN HISTORIC BUILDINGS.

IF YOU'RE EVER DEALING WITH ONE OF THOSE ON A REMODEL OR AN UPGRADE, THEY ACTUALLY HAVE THEIR OWN CHAPTER.

AND WHEN I SAY HISTORIC BUILDINGS, I'M TALKING ABOUT BUILDINGS THAT ARE ACTUALLY ON A NATIONAL STATE OR LOCAL REGISTRY, NOT JUST OLD ONE CONCESSION THAT THE EXISTING BUILDING CODE MAKES THAT'S HELPFUL.

AND THIS IS SOMETHING WE'VE REFERENCED BEFORE, BUT WE'RE ADOPTING.

THIS IS REPLACEMENT WINDOWS.

BASICALLY, IF YOU HAVE AN OPENING X BIG IN YOUR BRICK WALL, AND IT DOESN'T QUITE MEET THE SIZE REQUIREMENT FOR YOUR EMERGENCY ESCAPE AND RESCUE OPENING, THE CODE SAYS, BASICALLY DO THE BEST YOU CAN PUT AS BIG A WINDOW IN THAT OPENING, AS YOU CAN WITH AS BIG A OPENING AS YOU CAN.

IT CAN'T BE LESS COMPLIANT.

THERE ARE STILL THINGS THAT DO HAVE TO COMPLY ABOUT IT.

IF YOU REPLACE A WINDOW AND IT'S IN A LOCATION THAT'S SUPPOSED TO BE TEMPERED, IT HAS TO BE TEMPERED.

IT HAS TO MEET THE ENERGY CODE.

WE'RE JUST GIVING YOU A LITTLE GRACE ON THE SIZE, SAY, AND DO THE BEST YOU CAN.

THERE'S SOME LANGUAGE CLARIFYING THE RETROACTIVE REQUIREMENTS FOR SMOKE AND CARBON MONOXIDE ALARMS. IN GENERAL, IF YOU COME IN AND DO ALTERATIONS, WE MAKE YOU INSTALL SMOKE ALARMS AND CARBON MONOXIDE.

THIS CREATES SOME EXCEPTIONS, SMOKE ALARMS ARE REQUIRED RETROACTIVELY FOR MOST WORK EXCEPT FOR LEVEL ONE.

SO IF YOU'RE JUST HAVING YOUR COUNTERTOPS REPLACED OR SOMETHING, THEN YOU, THIS DOESN'T KICK IN FOR CARBON MONOXIDE DETECTORS.

IT'S SIMILAR LEVEL ONE WORK IS ACCEPTED ALSO PLUMBING AND MECHANICAL REPAIRS THAT HAVE NOTHING TO DO WITH A GAS APPLIANCE OR SYSTEM AND EXTERIOR SURFACES LIKE ROOFING.

WE DON'T GO BACK IN YOUR HOUSE AND MAKE YOU DO THIS.

NOW, THE PURPOSE OF ALL OF THESE IS FOR MINIMUM REQUIREMENTS FOR A REASONABLE LEVEL OF SAFETY AND A REASONABLE LEVEL OF SAFETY FOR EMERGENCY RESPONDERS.

PLEASE UNDERSTAND THAT WHEN WE GET TO THIS POINT, THESE CODES HAVE ALREADY BEEN VETTED THROUGH MANY CHANNELS, NOT JUST ON THE INTERNATIONAL LEVEL, THROUGH COMMITTEES, THROUGH CODE OFFICIALS VOTING.

THERE ARE A LOT OF ENGINEERS.

THERE ARE A LOT OF BUILDERS.

THERE ARE A LOT OF INDUSTRY GROUPS THAT ARE REPRESENTED AT EVERY LEVEL ON THE COMMITTEES OF THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS.

WE'VE GOT THE DALLAS BUILDERS ASSOCIATION, WE'VE GOT ENGINEERS, WE HAVE ARCHITECTS.

SO ALL OF THESE THINGS ARE THE PRODUCT OF VETTING THROUGH INDUSTRY VETTING WITH INDUSTRY, TRYING TO ACT IN THE BEST INTEREST OF INDUSTRY.

BUT TO BALANCE THAT WITH THE MINIMUM REQUIRES TO REQUIREMENTS, TO ACHIEVE A LEVEL OF SAFETY.

THAT IS THE TARGET OF THE CODES.

SO AGAIN, WE'RE GOING FOR JANUARY 1ST FOR THIS, FOR THIS TO BE EFFECTIVE.

ANYTHING THAT YOU SUBMIT PRIOR TO THAT, IF YOUR PERMIT NUMBER STARTS WITH 22, YOU'RE UNDER THE 2018 CODES.

IF YOUR PERMIT NUMBER STARTS WITH 23,

[00:25:01]

YOU'RE UNDER THE 2021 CODES, WE THOUGHT WE'D KEEP IT SIMPLE THAT WAY.

SO IF YOU HAVE, IF YOUR COMPANY HAS STOCK PLANS OR SOMETHING LIKE THAT, AND YOU'RE PREPARING TO CONTINUE A DEVELOPMENT INTO NEXT YEAR, THEN YOU NEED TO BE MAKING PLANS TO UPDATE ALL OF THOSE HOUSE PLANS FOR THE 2021 CODES.

CUZ PRIOR TO JANUARY 1ST, THEY WILL BE REJECTED.

IF THEY SAY 2018, EVEN IF IT'S THE SAME PLAN THAT YOU BUILT, TWO DOORS DOWN.

SO PLEASE PLAN FOR THAT.

ANYTHING THAT YOU'VE GOT COOKING ALREADY, ANYTHING THAT'S UNDER CONSTRUCTION, ANYTHING THAT'S UNDER REVIEW BEFORE JANUARY 1ST, YOU ARE GOOD TO GO ON THE 2018, BUT AFTER THAT WE'LL BE LOOKING FOR 2021 COMPLIANCE.

DO Y'ALL HAVE ANY QUESTIONS THAT BEAUTIFUL MM-HMM ON THE, UH, SELF-CLOSING UH, OR LATCHING DOORS IN THE GARAGE.

IS THAT JUST A SPRING HINGE? THAT IS TENSIONED ENOUGH TO WHERE THE DOOR WILL LATCH MM-HMM AND THEN YOU TYPICAL DOOR HARDWARE TO SHUT AND LATCH.

YEAH.

KEEP LOCK, WHATEVER.

YEAH.

OKAY.

UM, ON SMOKE ALARMS, ONED CEILINGS, UH, WE DO A LOT OF THOSE IN OUR HOMES.

WHAT'S THE HIGHEST POINT THAT WE NEED TO BE LOOKING AT INSTALLING.

A LOT OF TIMES WE'LL HAVE A, A TRIM BE THAT COMES DOWN MM-HMM WE'RE TALKING, YOU'RE TALKING ABOUT PUTTING A SMOKE DETECTOR RIGHT UP.

WE NEXT, HOW FAR DOWN HIGH POINT, HIGHEST POINT, RIGHT? OR IS IT 12? IT VARIES.

IT VARIES BY MANUFACTURE.

I, YOU ALSO HAVE TO CONSIDER WHAT EXACTLY CONSTITUTES A COMMERCIAL COOKING PLAN.

WE DO SOME COMMERCIAL COOKING RANGE, SLIDING RANGES.

THAT SHOULD BE SPECIFIED .

YEAH, I KNOW SOME OF THOSE GAS DRILLS LOOK PRETTY EXTRA.

YEAH.

ON THE, UH, EXTERIOR LIGHTING, UH, FOR THE DAYLIGHT SENSOR.

IS THAT ON EVERY EXTERIOR, EXTERIOR? ACCORDING TO CODE.

YEAH.

COACH LIGHTS OR JUST ONE FOR, YOU KNOW, SO YOU'VE GOT MULTIPLE LIGHTS ON THE PATIO.

COULD IT JUST BE THE COACH LIGHT ON THE BACK PATIO? THE COACH LIGHT, I WOULD THINK THAT WOULD ONLY APPLY TO A LIGHT THAT HAD ANY EXPOSURE TO DAYLIGHT FOR THAT TO BE AN ISSUE LIKE A CAN LIGHT UP UNDER A PATIO, I WOULD THINK WOULD JUST BE SWITCH CONTROLLED, BUT SOMETHING LIKE A COACH LIGHT OR SECURITY LIGHT WOULD HAVE TO BE DON TO DESK.

OKAY.

ON THE, UH, THE 10 FOOT TEST STACK.

IS THAT ON ROUGH HAND? TOP OUT MM-HMM ON THE BLOCKING AROUND THE TOILET.

UH, WHAT SIZE AND LOCATION? HEIGHT? UM, LOCATION.

UM, LOOKS LIKE THE PICTURE SHOWED PLYWOOD ON THERE.

YOU'D HAVE TO NOTCH OUT THE STU ALLOW IN, IN THERE.

IT'S HARD TO SAY, UM, THAT SOMETHING, WE COULD GET A, YOU KNOW, BASIC DIAGRAM THERE'S THAT'S IT.

ANYONE

[00:30:01]

ELSE? MM-HMM YES, SIR.

UH, BANNERS AND STAR CERTIFICATION.

IS THAT AN ACCEPTABLE PATHWAY? YES, ITS MM-HMM .

AND THEN ONLY OTHER QUESTION, WILL THIS POWERPOINT BE AVAILABLE TO US SOMEWHERE OR YES, WE'RE GONNA PUT IT UP ON OUR WEBSITE AND PDF FORM SHOULD BE UP BY NEXT WEEK.

YES, SIR.

R 10 ADDED DOORS THAT REQUIRED.

WE USUALLY CAN'T GET OURS THEIR BACK ORDERED.

CAN WE USE THE TENTS OVER THEM TO QUALIFY THE R 10? WE CAN'T HIT THEM.

YOU KNOW, I WOULD HAVE TO LOOK AT HOW THAT'S PHRASED.

I THINK THAT WOULD BE ACCEPTABLE AS LONG AS IT WAS MOUNTED PERMANENTLY.

RIGHT.

THEY DO FRISCO.

YOU CAN'T PUT THE OR SOMETHING LIKE THAT.

OKAY.

YEAH.

THE OTHER THING THAT WE DO IS ON TOP OF THAT, WE USE A DOUBLE BOARD LAYER THAT GETS US 10.

THEN WE JUST MAKE SURE IS THAT EXACTLY? WE'VE GOT THE PERIMETER OF THE NEW WALL INSULATED.

SO THE WHOLE CAVITY IS AT LEAST R 10.

YEAH.

AND THEN R 10 AND THEN THE DOUBLE R BOARD SITS ON TOP OF OUR NEW WALL.

PERSONALLY.

I'M NOT PICKING ON HOW YOU GET THERE, IF YOU CAN ACHIEVE THE R RATING AND HAVE IT BE PERMANENT AND NOT SOMETHING THAT THE HOMEOWNER IS JUST GONNA SET ASIDE.

WELL, THEY HAVE TO, WHEN THEY GO UP TO THEIR ATTIC, THEY HAVE TO LIFT THE, YOU KNOW, BUT THE ASSEMBLY IS PERMANENTLY ATTACHED.

YOU'VE GOT THE, THE WALL AROUND IT, ALL OF THAT.

IT'S NOT, YEAH.

REMOVABLE THE FRAME FRAMES.

IT, WE, IT, BUT YOU KNOW, OUR BOARD, THEY JUST HAVE TO LOOK DOWN SET IT.

SO DOES THAT GO FOR SCUTTLE HOLES AS WELL TO THOSE NEED TO BE INSULATED? YES.

THEY DO NEED TO BE INSULATED.

YES.

MA'AM QUESTION.

IN REGARDS TO, UM, REPLACING ROOF DECKING, WHAT'S THE MINIMUM OF THICK THAT, UM, HAS TO BE USED.

THERE IS ACTUALLY A CHART IN THE CODE BOOK.

IT DEPENDS ON THE WIDTH OF THE, THE SPACING OF THE SUPPORTS AND WHETHER OR NOT YOU HAVE EDGE SUPPORT.

IF Y'ALL WEREN'T AWARE, YOU CAN GET ALL OF THE CODES FOR FREE ONLINE NOW ON ICC, SAFE.ORG, JUST NAVIGATE TO CODES.

AND YOU CAN ACTUALLY VIEW THE TEXT IN ITS ENTIRETY FOR FREE, WITHOUT SIGNING UP FOR ANYTHING.

DON'T CLICK ON, SIGN UP, SIGN UP FOR PREMIUM ACCESS OR ANYTHING YOU CAN VIEW.

'EM COMPLETELY FREE.

CAN I ASK A QUESTION THAT WASN'T ON THE POWERPOINT? DID THE KEEP ON THE DID SURE BILLY WAS TELLING ADDITIONAL ADDITIONAL 18 SQUARE FEET OF THE, BUT IT SAYS MARK SPACE.

WHAT WE, SO WE WERE WONDERING IF WOULD TAKE THE, THAT NEVER BEEN ASKED THAT BEFORE I TO TELL YOU I HAVE IT ON TABLET, BUT I WAS KINDA CURIOUS, CAUSE OUR ISLAND ARE VERY BIG.

WE DON'T WANNA OVER IT WITH THE BLOOD.

SO DO WE HAVE, WE'VE GOT THE BOOK YOU TELL YOU WHAT WE'RE GONNA LOOK FOR THAT IF YOU GIVE US A SECOND DOES ANYONE ELSE HAVE QUESTIONS? ALRIGHTY.

WELL, I APPRECIATE Y'ALL COMING.

UM, THERE IS MY EMAIL ADDRESS.

IF Y'ALL THINK OF ANY QUESTIONS AND WANNA EMAIL ME, THEN ABSOLUTELY LET ME KNOW AND WE'LL SEE IF WE CAN HELP YOU OUT.

WE'RE GONNA DO A LITTLE BIT MORE PR ON THIS BEFORE IT GOES INTO EFFECT.

UH, RIGHT NOW WE'RE ON TRACK TO GO TO BUILDING AND STANDARDS COMMISSION ON OCTOBER 10TH, UH, COUNCIL, NOVEMBER 1ST AND THEN THE EFFECTIVE DATE WILL BE JANUARY 1ST.

SO COME TO THE FIRST OF THE YEAR, YOU'RE GONNA SEE SOME DIFFERENT REQUIREMENTS.

ALL RIGHT, THANKS.

Y'ALL THANK YOU.

SUBMITTED PRIOR TO SUBMITTED.

YES.

IT'S BASED ON THE SUBMITTED DATE.

APPRECIATE IT.

YEAH.